Implementation period: 2017-2018
Project location: Astana
Read moreThe essence of the project:
The essence of the project: The project was implemented on the eve of the 20th anniversary of the capital.
Implementation period: 2018
Project location: Astana
To date, 5 information leaflets have been posted
Read moreThe essence of the project:
Creating a network of media networks in Astana by creating the best Digital signageares for the comfort of the urban environment while improving the architectural appearance of the city, providing them with the right information at the right time and place.
The purpose of the project is to provide high-performance intelligent media platform - electronic media with visual media that fully inform the city streets. Creation of a unified information environment, full of new capabilities, with centralized intellectual management.
Main activities of information and navigation forms:
- Providing information to traffic participants, sharing urgent and necessary information to optimize traffic directions;
- Creation of conditions for mass information provision of the city
- Providing information and educational materials to guests and residents of the city
- Transition from past, outdated sources to modern, highly efficient media.
Implementation period: 2018
Project location: Astana
Read moreThe essence of the project:
The project placement of warm stop bus pavilions in astana will be implemented by with the investors of SEC. The project envisages the placement of warm stop bus pavilions at the investor's own expense on SEC-owned land. The land plot will be used on the basis of long-term land use right with temporary compensation in accordance with the joint operation agreement between the Company and the investor.
The State Institution "Architecture, Urban Planning and Land Relations of Astana" has approved a draft project, the pavilions of which are designed in accordance with this document.
According to the sketch design, the stop pavilion consists of an open part, a flat section and a commercial section.
The peculiarity of this investment project is that no local budget is allocated for the preparation and placement of bus stops.
In addition, the Mayor's Office of Astana will carry out engineering and communication infrastructure, reassemble the existing pavilions, and beautify the area where the stop pavilions will be located.
To date:
Initiator of the project: «Bar-Club Trety Time» LLP (subsidiary of World Class)
Cost of the project: 2 414 million tenge
Implementation period: 2020-2021
Power: 3 objects
Location:
1) Esil district, intersection of Orynbor, Akmeshit, Turkestan (botanical park) streets;
2) Esil district, I. Omarov Street (Zhagalau RC)
3) Saryarka district, 187th street (65 gymnasium)
Object Description:
The project envisages the construction of 3 fitness clubs
Construction area - 2136 m2 (1 object)
Construction volume - 19331 m3 (1 object)
Area of the complex - 1951 m2 (1 object)
Short term plan period: 6 months;
The purpose of the project: service of the population by arrangement of mini football fields and rent of football fields.
Read moreThere are 2 mini-football fields and an administrative building (1 shower room, 1 dressing room, 1 administrative area) in the territory of the Manche.
The target group is young people and children over the age of 10, adults who are engaged in this sport and also employees of the company who regularly engage in amateur football after work. а также офисные сотрудники компании, которые систематически играют в любительский футбол после рабочего время.
Initiator of the project: «Crystal-Auto» LLP
Investor: «Crystal-Auto» LLP
Cost of the project: 997 740 000 tenge
Implementation period: 2019-2020
Power: 1 730 square meters
Place of work: 24 people
Location: Nur-Sultan city, Esil district, Turan avenue
Read moreDescription of the object:
- sale of Renault brand cars;
- Sale of spare parts;
-Aftermarket service, warranty and after-sales service After-sales service and warranty service for your car
Sale of spare parts
Implementation period: 2017-2018
Project location: Astana
«NC JSC «SEC “Astana” Share of participation of in the project - 9%
Read moreThe essence of the project:
The project uses modern construction technologies in Astana, construction of a refueling station and gas filling station for motor vehicles that meet all the standards of industrial and environmental safety, providing goods and additional services for consumers. The project provides free charging of vehicles with all traditional types of fuel, liquefied petroleum gas, as well as electric vehicles. Проект включает в себя организацию заправки автомобилей всеми видами традиционных ГСМ,
To date, 3 complexes have been built and are operational, and it is planned to build another 2 in 2018.
Applicant: ‘Logistar’ LLP
Implementation period: end of November 2014
Project location: Astana
Read moreProject goal: Creation of a logistics center in Astana with a fruit storage warehouse with a capacity of 500 tons, as well as sales and purchasing services to stabilize prices in the fruit market in Astana
Total cost of the project: 252 466 thousand tenge.